Accepting conditions:

1. Construction and repair works completed

 

2. The facade of the building completed

 

3. Entrance decorated and painted

 

4. exteriors made with doors from metal-plastic and windows with glass package                                             

 

5.Vertical system of water and sanitation are installed in the apartment

 

6. the central doors are mounted

 

7. internal partitions are instaled by blocks

 

8. elevators are Installed

 

9. pipe withnatural gas are setup into the entrance of each floor