Completed
100%

|   New Line  - Live in comfort

      -25 floors

     - Two level parking

     -High quality  windows

| Apartments from 46.80 sq. M in a white frame:

     - Dry plaster (consist from cement)  based on new technology

     - Electricity (montage and installation of light points,switches ,plugs)

     - Floor screeding by sand cement mix

     - All Sanitary engineering

     - Metal doors of high quality are installed (sheet from 3mm metal)

| Detail info about white frameLink

Installed in appartment
01.
Metal sheet door
02.
Fright and passenger elevators
03.
window glass from Saint Gobain
In Complex operates
24 hours 
security
Parking 
place
Entrance CCTV
monitoring
Garden
care
accepting conditions
Exteriors made with doors from metal-plastic and windows with glass package
The main vertical pipes of water and sewage have been brought to the apartment
The central doors are mounted
Internal partitions are instaled by blocks (according to the desired project)
Freight and passenger elevators are installed
Central gas pipe is brought to the entrance
Construction-repair works are completed
The facade of the building is finished
Entrance decorated and painted